Answers are grounded in this paper and cite their sources.
Business competitiveness, survival and growth needs, as well as innovations in the construction industry are driving organisations to make strategic decisions to modify their traditional management systems. Lean Construction, a construction project management methodology with its roots in Lean Management in the manufacturing industry, has been developing since the 1990s. A method included in this methodology is the Last Planner System (LPS), a construction planning method. At the beginning of the 21st century, the Kazakh company BI Group took the strategic decision to implement the Lean Construction methodology in its project management, in particular the LPS. This company is explored as a case study with the aim of identifying the factors that have affected the Last Planner System implementation through a SWOT analysis (Strengths, Weaknesses, Opportunities, Threats). For this purpose, semi-structured interviews were conducted with professionals from BI Group and a qualitative analysis was carried out using the QDA Miner Lite programme. A total of 16 factors are identified, with employee resistance to change as a weakness, and increased transparency and team responsibility as strengths. The threats highlighted are the need for continued investment to maintain the system, while opportunities include enhanced interaction with subconstractors and improved service quality. The strategic decision of implementing LPS has brought positive results for the company, improving its competitiveness and corporate image. The factors identified may be useful to other construction companies, of similar or different sizes, that wish to implement this method to manage their construction works.
No takes yet. Share an insight, caveat, or question.
Sadvokassova et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: