Electricity-grid construction requires project-level evidence to plan waste quantities and removal. This study develops and applies a method that combines mandatory electronic waste-transfer records (e-GAR) with project characteristics to generate auditable indicators of intensity, composition, removal timing and management routing. The method was tested using 258 records from 14 Portuguese transmission-line and substation projects, representing 431.9 t. It produced median intensities of 0.899 t km−1 and 0.312 t support−1 for lines, and 5.872 kg m−2 and 11.994 t bay−1 for completed substations, providing rare empirical indicators for grid construction. Leave-one-project-out evaluation identified electrical-bay count and observed duration as the most informative substation descriptors, reducing median estimation error from 62.7% for a no-scale reference to 33.0% and 38.3%. The temporal component quantified the influence of individual dispatches and showed a persistent late-removal profile in substations: after the largest dispatch was excluded, median t50 remained 0.77. Composition analysis mapped substantial project-level variation, while routing analysis showed that 80.1% of mass entered R12, identifying the principal flow for downstream verification. Together, these results demonstrate how mandatory records can support organisations in building, testing and progressively refining evidence-based indicators for future waste planning.
No takes yet. Share an insight, caveat, or question.
Mendes et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: