Answers are grounded in this paper and cite their sources.
Wastewater stabilization ponds (WSPs) provide low-energy municipal wastewater treatment, but sludge accumulation reduces available pond volume. This observational case study examined phased desludging and treatment performance using nine years (2017–2025) of monitoring at one full-scale WSP system. Bathymetric surveys were integrated with routine physicochemical monitoring and multivariate statistical analyses to investigate the relationships among sludge accumulation, hydraulic restoration, and treatment performance. Process efficiency was assessed using biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids (TSS), dissolved oxygen (DO), and hydraulic loading data. Operational bathymetric summaries indicated an estimated sludge occupation of approximately 92% in the most affected anaerobic ponds. Comparing the pre-desludging (2017–2019) and post-desludging (2024–2025) periods, mean BOD5 removal increased from 68.52 ± 5.75% to 80.43 ± 3.61% and TSS removal from 65.11 ± 5.10% to 83.23 ± 3.18% (both p < 0.001). COD removal decreased from 64.36 ± 5.81% to 60.78 ± 6.79% (p = 0.043), despite a decrease in final effluent COD concentration from 330.6 ± 74.5 to 158.0 ± 32.5 mg L−1. Influent COD concentration and load also declined substantially, limiting attribution of the effluent change to desludging. Phased desludging restored available pond volume and coincided with changes in treatment performance. Together, sludge-depth surveys and operational monitoring can inform condition-based maintenance. The single-site observational design, changing influent loads, and absence of direct hydraulic tracer measurements preclude a causal attribution of the observed performance changes.
No takes yet. Share an insight, caveat, or question.
Zahir et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: