Answers are grounded in this paper and cite their sources.
This study presents a pilot-scale train for acid mine drainage (AMD) valorization at the Tharsis mining district (Huelva, Spain), integrating selective Fe/Al removal by controlled neutralization, biological sulfide production in an anaerobic sulfate-reducing membrane bioreactor (AnMBR) fed with glycerin, metal sulfide precipitation, and ion-exchange (IEX) polishing. Neutralization removed >99% of Fe and 80–95% of Al while preserving Zn, Co and Ni in solution, although Cu was partially co-precipitated (54%). The AnMBR was operated for 260 days across four phases of increasing sulfate loads. It achieved up to 95% sulfate removal with reduction rates reaching 4,662 mg SO₄ 2− L −1 d −1 and dissolved sulfide concentrations up to 300 mg L −1 . Additionally, the system successfully adapted to the transition from synthetic feed to real IEX effluent. In the precipitation unit, removal was sequential: Cu was quantitatively removed across all conditions, Zn was removed progressively with increasing sulfide availability, and Co and Ni required both higher sulfide availability and pH above 5.5, so that the sulfide-to-metal ratio determined the extent of recovery of each metal. Sludge was enriched in Zn- and Cu-bearing sulfides, with a (Zn + Cu)/S molar ratio consistent with sulfide stoichiometry. The IEX step retained Co (98%), Ni (97%) and Zn (89%), limiting the metal load recirculated to the bioreactor. A pilot-based cost assessment showed that the AnMBR accounted for 73% of the operating cost, mainly due to electron donor and nutrient supply. These results provide engineering data for the scale-up of biologically driven AMD treatment combining metal recovery, sulfate reduction and potential water valorization.
No takes yet. Share an insight, caveat, or question.
Fernandez-Rojo et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: