Water and sanitation projects in Kenya continue to experience cost overruns, schedule delays and stakeholder dissatisfaction, despite substantial public and donor investment. Earned Value Management (EVM) integrates scope, schedule and cost into a single performance measurement system, yet its application in Kenyan water projects remains limited and insufficiently documented. This study examined the influence of two EVM techniques, foundational EVM techniques (Planned Value, Earned Value and Actual Cost) and EVM performance index techniques (Cost Performance Index and Schedule Performance Index), on the performance of water and sanitation projects under Athi Water Works Development Agency in Nairobi, Kiambu and Muranga counties. The study was anchored on project control theory. A descriptive cross-sectional survey design was adopted. Using Yamane's formula and stratified random sampling, 120 professionals were selected from a population of 170 project managers, engineers, site supervisors, procurement officers and government officials. Data were collected using a structured questionnaire, and 102 usable responses were obtained, a response rate of 85%. Data were analysed using descriptive statistics, Pearson correlation and multiple linear regression. Respondents agreed that foundational EVM techniques (M = 3.68, SD = 0.70) and performance index techniques (M = 3.66, SD = 0.68) were applied in their projects. Both techniques had strong, positive and significant relationships with project performance (r = 0.684 and r = 0.678, p < 0.001). Together, the two techniques explained 69.2% of the variance in project performance, F(2, 99) = 111.05, p < 0.001. Foundational EVM techniques (Beta = 0.512, p < 0.001) and performance index techniques (Beta = 0.503, p < 0.001) each made a significant unique contribution. The study concludes that clearly defined baselines and routine use of cost and schedule performance indices are associated with better project performance. It recommends training of project staff in EVM, consistent recording of Planned Value, Earned Value and Actual Cost, and the use of CPI and SPI in all project progress reports.
No takes yet. Share an insight, caveat, or question.
Ochieng et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: