Answers are grounded in this paper and cite their sources.
The uncertainty of structural defects in end-of-life products disrupts disassembly planning and logistics scheduling. This article proposes a two-stage integrated scheduling strategy incorporating Bayesian-classified structural uncertainties. A beta–binomial Bayesian classification framework quantifies the posterior probabilities of structural damage and loss, and a minimum Bayes risk rule classifies each component. A two-stage mixed-integer linear programming model then minimizes the overall makespan covering disassembly job and automated guided vehicle scheduling, solved by an adaptive hybrid genetic discrete grey wolf optimization (AHG-DGWO) algorithm with posterior-guided operators. Experiments on 15 instances from a real power-battery disassembly plant show average makespan reductions of 36.7% and 12.6% over random and independent strategies, respectively; AHG-DGWO achieves the best mean value in 12 out of 15 instances against four metaheuristics, with statistically significant improvements confirmed by Wilcoxon tests and ablation and benchmark studies.
No takes yet. Share an insight, caveat, or question.
Kuang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: