Performance measurement supports the monitoring of construction projects, but commonly used indicators may not capture the full range of project outcomes. This study assessed the performance measurement metrics used in construction projects in Lagos State, their perceived effectiveness, implementation challenges and possible improvements. A descriptive survey was conducted using questionnaire responses from 300 construction professionals selected through purposive sampling. Data were summarized using frequencies, percentages, means and Relative Importance Index values. Budget variance was the most frequently used metric (mean = 3.65; RII = 0.91), followed by quality evaluation (3.45; 0.86), client satisfaction (3.44) and schedule performance (3.42; 0.86). Respondents generally considered current measures useful for assessing project success, safety compliance, early issue identification, budget and quality. The leading reported limitation was that existing systems did not cover all aspects of project performance (3.46; 0.87), followed by implementation cost (3.36; 0.84) and insufficient staff training (3.34; 0.84). Respondents supported context-specific measures, more detailed criteria, sustainability indicators, regular training and digital real-time monitoring. The findings suggest that conventional cost, time and quality measures remain important, but need to be used alongside safety, sustainability, stakeholder satisfaction, productivity and risk indicators. The results reflect the views of the sampled Lagos professionals and should not be treated as nationally representative.
No takes yet. Share an insight, caveat, or question.
Odelade et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: