Answers are grounded in this paper and cite their sources.
Purpose This study addresses limitations of centralized construction project management systems, including lack of transparency, accountability and collaboration, and aims to develop and validate a decentralized blockchain-based approach for construction project management. Design/methodology/approach Using the Design Science Research methodology, a decentralized platform integrating Ethereum, InterPlanetary File System (IPFS) and Node.js was developed for asset tracking, progress monitoring and performance evaluation. The framework was validated across six large-scale construction projects in Egypt using project documents, blockchain records and system reports. Performance, latency, storage efficiency and expert assessment were evaluated, with smart contracts supporting asset versioning and progress control and IPFS enabling traceable off-chain storage. Expert assessment involved 15 construction professionals and project managers. Findings Application across six construction projects (49 Master Reports and 335 Progress Reports) demonstrated the framework's operational feasibility for near-real-time monitoring and traceable information management. Transaction and query latencies were below 5 and 2 s, respectively, while IPFS-based off-chain storage reduced on-chain requirements by up to 99.91%. The ZED Towers Phase 1B case confirmed traceable linkage between progress records and as-built digital assets. Expert evaluation (n = 15) achieved a mean score of 4.62, with a Cronbach's alpha of 0.94. Originality/value Rather than proposing a new blockchain architecture, this study integrates Ethereum smart contracts, IPFS, building information modelling, Internet of Things and a near-real-time monitoring dashboard into a construction-specific information management platform. Its novelty lies in configuring these established technologies to address construction requirements and validating their applicability across six large-scale projects in Egypt for decentralized information management, asset versioning, progress monitoring and lifecycle traceability.
No takes yet. Share an insight, caveat, or question.
Soliman et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: