Türkiye has large offshore wind potential and a new tender in preparation, but no operating farm. This review asks how far Turkish research can support the design of a first project. A structured search of four databases, including the national thesis center, was run on 28 October 2026. The review includes 102 studies of Turkish sites, 24 of them graduate theses. The review covers the four Turkish seas and six candidate sites. Most studies stop at screening or techno-economic feasibility; none uses offshore measurements at a candidate site. Published peak wave periods are typically 4–5 s, but return values and wind–wave misalignment are missing for most sites. Coastal peak ground acceleration near the sites is 0.18–0.56 g, and no site has a site-specific hazard analysis. The 2026 candidate areas lie mostly in water shallower than 60 m, so a first project would most likely be fixed-bottom. Floating systems matter for the deeper resource, yet only one floating concept has been sized for a Turkish site. Port and grid studies rarely go beyond distance, and no cost study tests the draft tender terms. The methods are standard; the missing pieces are measured site data and worked designs at the candidate sites.
No takes yet. Share an insight, caveat, or question.
Uçar et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: