Answers are grounded in this paper and cite their sources.
Background: Placing distributed generation (DG) and flexible AC transmission system (FACTS) devices together can reduce losses and support voltage in transmission networks, but solver comparisons often use unequal computing budgets and report the benefit at rated DG output. Methods: Five metaheuristics (PSO, a swarm variant of MVMO-SH, a Monte Carlo hybrid PSO (MC-HPSO), GWO and DE) were compared on the joint placement and sizing of two DG units, one STATCOM and one TCSC on the IEEE 30-, 57- and 118-bus systems. Each candidate was evaluated by a full NewtonRaphson power flow, each solver received 6000 power-flow solves per run, constraints were handled by a linear penalty, and 20 independent runs per solver were compared using Kruskal-Wallis, Holmadjusted Mann-Whitney tests and the Vargha-Delaney effect size. Returned placements were also evaluated over 1000 held-out wind and solar scenarios, and two scenario-aware DE baselines were added. Results: Base-case losses of 17.56, 27.86 and 132.86 MW were reduced at rated output by 40 %, 48 % and 17 %, with MVMO-SH best on the 30- and 118-bus systems and DE best on the 57-bus system. MVMO-SH and DE were the most reliable solvers; MC-HPSO, which performs one tenth of the fitness evaluations, was poor at rated output. The expected loss reduction over the held-out scenarios was only 4 % to 11 %, mainly because the mean wind and solar capacity factors are low. On the IEEE 57-bus system, placements that were feasible at rated output still violated a voltage limit in most scenarios. Conclusions: Rated-output loss reductions overstate the benefit of DG and FACTS placement under renewable uncertainty, so feasibility should be checked over scenarios; MVMO-SH and DE are suitable solvers under an equal budget. Code and per-run data are provided.
No takes yet. Share an insight, caveat, or question.
Tripathi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: