Answers are grounded in this paper and cite their sources.
Large-scale landslide mitigation projects face complex environmental influences and decline in service performance over their service life. To enhance the level of risk management in landslide mitigation projects, this study developed an operational risk assessment system for such projects based on the Hierarchical Holographic Model (HHM). The system comprises 18 secondary indicators across 4 dimensions: hazard source, retaining structures, environmental factors, and management factors. The Best-Worst Method (BWM) and the improved CRITIC method are used to extract subjective and objective weights, respectively, and a combined weighting scheme is implemented based on game theory. Building on this, a bivariate normal cloud model is introduced to determine the risk indicator levels. The case study results indicate that the operational risk level of the Huangtupo landslide mitigation project is Level III, which is considered a general risk. Notably, the numerical characteristics of the risk clouds regarding the probability and consequence levels for cumulative displacement and stress overload exhibit high values, specifically representing expected values of 5.80 and 6.50 for cumulative displacement, and 6.50 and 7.20 for stress overload, respectively. These two factors should be central to risk management.
No takes yet. Share an insight, caveat, or question.
Cheng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: