Answers are grounded in this paper and cite their sources.
To address the transmission capacity constraints and high reserve offer costs associated with cross-regional reserve sharing under high renewable energy penetration, this paper proposes a method for designing cross-regional virtual reserve services based on spatially transferable loads in data centers. First, a data center task migration model that considers task queues, transmission bandwidth, processing capacity, and deadline constraints is established to quantify the relationship among load reduction on the task-exporting side, additional electricity consumption on the task-importing side, and the reserve capacity of supporting generating units. Second, a novel Cross-Regional Virtual Reserve Consortium (CRVRC) business model is proposed to incentivize data centers and supporting generating units to jointly provide cross-regional reserve through joint bidding and revenue allocation. Then, a robust joint clearing model for energy and reserve that considers uncertainty in renewable energy output is established and solved using the Benders decomposition algorithm. Finally, case studies based on a modified IEEE 14-bus system show that, compared with the baseline, the proposed method reduces the joint clearing cost by 5.02% and the reserve offer cost by 3.60%, increases data center net profit by 89.73%, and maintains transmission margins on all cross-regional tie lines under wind power forecast deviations.
No takes yet. Share an insight, caveat, or question.
Zuo et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: