Answers are grounded in this paper and cite their sources.
This study assesses the techno-economic performance of hybrid renewable energy systems for rural electrification in Ghana, using Kunsu Camp as a case study. Six off-grid configurations incorporating photovoltaic generation, diesel and biodiesel generators, fuel cells, and battery storage were compared using previously reported HOMER Pro optimization results. The PV/diesel/battery configuration recorded the lowest Net Present Cost (NPC) of $392,258 and Levelized Cost of Energy (LCOE) of $0.179/kWh, with an initial capital investment of $242,446. Configurations incorporating biodiesel generation achieved higher reported renewable fractions, reaching 97.6%, but incurred higher overall costs. Sensitivity analysis indicated that reducing the nominal discount rate from 12.61% to 8% decreased the calculated LCOE by approximately 26.1%, while increasing NPC by 28.0%. A 50% subsidy on the initial capital investment reduced both NPC and LCOE by approximately 30.9%. The sensitivity assessments further illustrated the influence of solar-resource availability and diesel fuel prices on electricity generation costs under the assumed operating conditions. The findings highlight the importance of balancing technology selection, financing arrangements, and long-term electricity costs when evaluating hybrid energy systems for rural electrification.
No takes yet. Share an insight, caveat, or question.
Awopone et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: