Answers are grounded in this paper and cite their sources.
Enterprise branch sites now routinely terminate three transports — a broadband circuit, a private circuit (still, in most enterprise estates, an MPLS L3VPN handoff) and a cellular modem — and the question of which should carry production traffic, which should stand as backup, and how the failover between them should behave is usually decided one dimension at a time. A procurement-led branch gets the cheapest underlay the site survey allows; an architecture-led branch gets a private circuit because the reference design says so; a compliance-led branch keeps the cellular link idle because no policy has been written down under which it may carry production traffic. This paper reports a policy-driven underlay selection and failover design the author built and has operated across a branch estate, in which cost per branch per month, measured availability, and application performance for the branch's traffic mix are evaluated jointly, and in which the cellular backup is kept pre-provisioned and warm so the availability property holds by construction. The paper is a design report rather than a controlled study, and it documents the behaviour observed in operation at the author's branch deployments.
No takes yet. Share an insight, caveat, or question.
Shimul Shah (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: