State transportation agencies manage large portfolios of infrastructure projects under conditions of limited resources, regulatory oversight, and public accountability, yet their portfolio management processes frequently remain fragmented and weakly standardised. This article presents the design of a maturity model for project portfolio management in state transportation agencies, developed through applied, design oriented research and applied to the case of the South Carolina Department of Transportation (SCDOT). The diagnosis identified four root causes in the preconstruction phase: lack of standardisation in design review and quality control, deficient application of the Critical Path Method, coordination delays with utility companies, and insufficient staff training. Drawing on OPM3, P3M3, CMMI, and the FHWA capability maturity frameworks, the model defines five maturity levels and six dimensions, with an implementation design including objectives, responsible units, a 24 month schedule, indicators, and an estimated budget of USD 235,750. The design targets stated are objectives of the proposed intervention, not measured results. The paper is derived from the author master thesis (SUMMA University, 2025) and is under submission to a peer reviewed journal.
No takes yet. Share an insight, caveat, or question.
Jefferson M. Rojas Castro (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: