Answers are grounded in this paper and cite their sources.
As the ultimate physical barrier in a fusion energy experimental facility, the prestressed shear wall is subject to cumulative prestress loss during construction and long-term service. Owing to its large dimensions, substantial thickness, and curved geometry, accurate monitoring of the prestress in both the steel strands and the wall concrete is required to ensure long-term structural safety. In this study, Fiber Bragg Grating (FBG) pressure rings were installed at the ends of the prestressing steel strands, and embedded FBG strain gauges were deployed within the concrete to monitor prestress in both the strands and the wall concrete. The monitoring results were further compared with theoretical calculations and Midas Gen finite-element simulations, enabling a comprehensive assessment of the prestress state of the shear wall. The results show that, during construction, the maximum prestress loss in the steel strands was 22.08%, with an error of only 2.35% relative to the theoretical prediction, while the stress distribution in the wall concrete agreed well with the finite-element results. During service monitoring, the maximum prestress loss reached 11.04%, and the maximum deviation from the code-based prediction was 1.63%, indicating effective construction quality control. The proposed monitoring strategy based on FBG pressure rings and embedded FBG strain gauges provides reliable data support for the safety assessment and long-term operation and maintenance of similar prestressed structures in nuclear engineering.
No takes yet. Share an insight, caveat, or question.
Zhu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: