Answers are grounded in this paper and cite their sources.
This study was conducted on the Line Extruder production process at PT XYZ, which faced a significant raw material waste problem involving corn flour, exceeding the company’s Key Performance Indicator (KPI) target of 1%. Based on data collected from July to December 2025, the average waste rate reached 3.27%, resulting in a total material loss of 9,330.5 kg and an estimated financial loss of IDR 57,849,100. This study aims to identify the root causes of waste, establish improvement priorities, evaluate the effectiveness of corrective actions based on changes in the waste percentage, and improve raw material utilization efficiency. The methodology employed the DMAIC (Define, Measure, Analyze, Improve, and Control) framework integrated with the Six Sigma approach. The analysis utilized Critical to Quality (CTQ), Pareto diagrams, fishbone diagrams, a prioritization matrix, 5W1H analysis, and Failure Mode and Effects Analysis (FMEA). The findings indicate that the primary sources of waste were machine start-up and shutdown operations, elevated temperatures in the electrical control panel area, and conveyor design. The highest Risk Priority Number (RPN) was 432, associated with panel overheating. Corrective actions were implemented through improvements to the extruder panel cooling system and the installation of a conveyor chute. Following the implementation of these improvements, the usage variance decreased from 3.27% to 0.84%, the panel temperature declined from 39.47°C to 24.97°C, start-up and shutdown waste was reduced to 99.40 kg/day, and material fall-off waste decreased to 4.60 kg/day. These findings demonstrate that the proposed improvements developed through the DMAIC approach effectively reduce material waste and enhance production process efficiency.
No takes yet. Share an insight, caveat, or question.
Sylvia et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: