Answers are grounded in this paper and cite their sources.
In January 2025, Fujian Province lowered the budget threshold for mandatory remote cross-regional bid evaluation in general services from RMB 10 million to RMB 5 million. This study examines 3,600 procurement projects in 2024 and 2025. A difference-in-discontinuities design compares the jumps at the cutoff in evaluation adoption and first-round awards to suppliers outside the buyer's city. In the main window (RMB 4.2–5.8 million), the jump in adoption increased by 66.4 percentage points (95% confidence interval, 55.6 to 77.2), and the jump in out-of-city awards increased by 20.4 points (6.2 to 34.6). Awards to suppliers outside Fujian accounted for 15.4 points of the latter increase, and awards to suppliers in other Fujian cities accounted for 5.0 points. At bandwidths of RMB 0.6 million and RMB 1 million, the estimates for out-of-city awards were 15.3 points (−1.2 to 31.8) and 16.6 points (3.6 to 29.7), respectively. The increase in out-of-city awards corresponded chiefly to a decline in local awards.
No takes yet. Share an insight, caveat, or question.
Deng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: