Answers are grounded in this paper and cite their sources.
Cost overruns continue to undermine the value, affordability and timely delivery of public infrastructure in Nigeria. Although cost planning, competitive procurement, value engineering, contract administration and project monitoring are established cost-management practices, their presence does not necessarily translate into effective cost containment. This paper critically examines how these strategies operate and why their performance is constrained in Nigerian public infrastructure delivery. It adopts a structured critical review of published research and relevant institutional material, with evidence organised around strategy design, implementation conditions, reported outcomes and governance context. The synthesis indicates that cost-control effectiveness is conditional rather than automatic: early and reliable project definition, realistic estimates, disciplined change control and continuous cost reporting can support cost discipline, but their influence is weakened when scope changes, market volatility, fragmented accountability, weak enforcement and inadequate professional capacity are not managed. The paper therefore interprets cost overruns as a system-level performance problem arising from interactions among technical, commercial, managerial and institutional factors, rather than as the consequence of deficient estimating alone. Its principal contribution is an implementation-oriented cost-governance framework that links preventive controls, in-project detection and corrective action to institutional accountability. The framework is proposed as an analytical synthesis for practitioners and policymakers, not as an empirically validated predictive model. The paper recommends stronger front-end appraisal, transparent procurement and variation records, independent cost assurance, timely payment and decision processes, and proportionate use of digital project controls. Because the study is desk-based, its conclusions depend on the quality and contextual fit of available sources; future empirical work should test the framework against project-level cost data and stakeholder evidence.
No takes yet. Share an insight, caveat, or question.
AKINSANYA et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: