Answers are grounded in this paper and cite their sources.
This study examined the relationship between resource, scope, risk, and quality planning and the success of Educate Project Phase II in Karongi District, Rwanda. A descriptive, correlational, and explanatory mixed-methods design was used. From a population of 392, a sample of 194 was targeted; 145 valid questionnaires and 27 key-informant interviews were obtained (172 participants overall). Quantitative analysis of the 145 questionnaires employed descriptive statistics, Pearson correlations, and multiple regression in SPSS 26; interviews were summarised thematically. Respondents generally agreed that planning practices were implemented, while interviews emphasised timely resources, clear scope, risk preparedness, and quality monitoring. All four practices correlated positively with project success (r = 0.561–0.694, p < 0.01). The overall regression was significant (R² = 0.620; F = 57.156, p < 0.001). Resource planning (β = 0.577) and risk planning (β = 0.380) were the strongest reported positive predictors. In contrast, the reported significance levels for scope and quality planning require checking against their t-statistics. The study recommends prioritising resource availability, risk monitoring, clear project scope, and continuous quality assurance.
No takes yet. Share an insight, caveat, or question.
Muhimpundu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: