Answers are grounded in this paper and cite their sources.
Uncertain processing times complicate the allocation of production batches between internal machines and external manufacturers. Motivated by a display manufacturer in China, this study develops a Wasserstein distributionally robust model that jointly determines which batches to outsource and how to schedule the remaining batches on parallel machines. The model minimizes effective outsourcing costs and worst-case expected completion-time costs while limiting each machine’s overload probability and bounding the expected total outsourced workload. We derive an equivalent mixed-integer linear reformulation and develop a branch-and-Benders-cut algorithm. In the computational experiments, the proposed model yielded lower reported overload risk than deterministic optimization and sample-average approximation. In a separate out-of-sample evaluation, it reduced average cost by 6.08% relative to SAA and 13.35% relative to deterministic optimization. The algorithm also returned solutions sooner than the compact formulation on several larger instances. In the factory application, the average reported outsourcing-partner satisfaction rate was 94.74% over the observation period. These findings illustrate how the model can help manufacturers balance internal capacity protection with external workload requirements.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: