Answers are grounded in this paper and cite their sources.
Statement of the problem. The application of algorithmic methods for solving the problem of stones to optimize the allocation of resources in the construction industry is considered. Results. The classical formulations of the problem of dividing a set of elements into groups with a minimum maximum weight are investigated, their computational complexity and practical applicability are analyzed. Modified algorithms are proposed, including a two-pass greedy algorithm with binary search and a method for reducing to the maximum flow problem in the network. Using the example of the distribution of work volumes between structural divisions of a construction company, the effectiveness of the proposed approaches is demonstrated. Conclusions. It is shown that the combination of heuristic and accurate methods allows us to find solutions close to optimal in conditions of limited resources and tight time frames. The results of the work can be used to develop automated decision support systems in project management.
No takes yet. Share an insight, caveat, or question.
Баркалов et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: