Answers are grounded in this paper and cite their sources.
Construction and demolition waste reduces material productivity, consumes landfill capacity and represents a loss of resources when avoidable material losses are not controlled. This study assesses construction-waste generation and related resource-efficiency practices across five selected building and infrastructure projects associated with Shapoorji Pallonji and Company Private Limited (SPCPL). A descriptive case-study approach was adopted using project waste records, site observations and documented waste-management practices. Five material streams were examined: concrete/ready-mix concrete (RMC), reinforcement steel, autoclaved aerated concrete (AAC) blocks, mixed construction and demolition (C&D) waste, and bricks. The recorded average percentages were 2.04%, 2.91%, 4.25%, 2.34% and 6.14%, respectively. Bricks and AAC blocks showed the highest recorded averages, while project-wise results varied across all material categories. The study also considers material planning, storage, source segregation, reuse, recycling, 5S-based workplace organization, Just-in-Time practices and source-level controls. The findings support material-specific waste prevention rather than reliance on a single project-wide waste indicator. However, the original measurement denominators and reporting periods are not consistently established in the available records; therefore, the percentages are treated as reported descriptive values and are not aggregated or interpreted as fully standardized performance rates. Practical measures are proposed to strengthen project-level resource efficiency.
No takes yet. Share an insight, caveat, or question.
Alam et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: