Answers are grounded in this paper and cite their sources.
Fibre to the Home (FTTH) networks are central to Tanzania's digital transformation agenda, yet the FTTH network operated by Tanzania Telecommunications Corporation Limited (TTCL) in the Dar es Salaam Region operates at approximately 91% availability, well below the 99.999% carrier-grade benchmark. Manual and fragmented maintenance practices, delayed fault communication between field technicians and the Network Operations Centre (NOC), and a predominantly reactive maintenance culture contribute to this gap. This study aimed to develop a Computerised Maintenance Management System (CMMS) for enhancing the availability performance of TTCL's FTTH network. A mixed-methods design integrated with a design science approach was adopted. Structured questionnaires were administered to 100 respondents drawn from 135 FTTH maintenance-related staff and were complemented by NOC fault logs and maintenance records. The Relative Importance Index (RII) was used to rank eleven factors, of which seven were significant, led by fibre cuts from civil works and excavation (RII = 0.918), field-to-NOC communication quality (RII = 0.912), and power outage at site (RII = 0.888). The seven significant factors were used to develop a multiple linear regression (MLR) maintenance management model using a 70/15/15 training, validation, and test split. The model explained 97.8% of the variance in availability performance in the training set, achieved R² = 0.983 on the test set with a mean absolute percentage error below 2.2%, and was significant overall (F = 387.37, p < 0.001). The validated model was embedded in a web-based, role-based CMMS prototype with modules for availability prediction, fault tickets, work orders, assets, preventive and corrective maintenance, inventory, reporting, and user management. All 35 functional test cases passed in a controlled environment. The study concludes that TTCL's availability challenges arise from measurable factors that can be computerised to support proactive, data-driven maintenance, and recommends pilot deployment followed by longitudinal evaluation.
No takes yet. Share an insight, caveat, or question.
Joseph et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: