Answers are grounded in this paper and cite their sources.
Urban trail construction can constrain existing roadside drainage corridors and alter water levels, flow velocity, culvert interaction, and erosion demand. This study evaluates a trail-constrained drainage retrofit in Moline, Illinois, USA, by linking changes in channel hydraulics to a proposed culvert-extension check and local lining demand. The study used StreamStats design hydrology, one-dimensional steady-flow HEC-RAS 6.5 outputs, HY-8 8.0.0 results, and HEC-15/IDOT riprap calculations. Existing and proposed conditions were compared at 24 matched HEC-RAS sections for the 10-, 25-, 50-, and 100-year events. Mean channel velocity decreased by 34.9–44.7%, while the median station-level water-surface-elevation (WSE) increase was 0.11–0.15 m; the corresponding mean WSE increase was 0.37–0.45 m because a small number of sections exhibited larger local changes. Velocity reductions were concentrated primarily within the reconstructed reaches, where mean reductions were about 54–56%; changes outside the reconstructed reaches were smaller and more variable. A targeted influence check excluding the anomalous downstream Station 2 found lower proposed-condition velocities at all 23 retained sections. A section-scale numerical sensitivity screening using plausible perturbations in roughness, discharge, and friction slope produced individual depth changes of less than 0.08 m at two representative reconstructed sections; a combined high-stage case increased depth by approximately 0.10–0.15 m without reversing the principal velocity-reduction pattern. The HY-8 calculation indicates that the proposed extension, 1.52 m in diameter, did not introduce an additional modeled restriction at the 100-year upstream design discharge of 5.89 m3/s, while the 10-year HEC-15 check showed that the lining satisfied the adopted stability criterion at all 13 evaluated design stations. Interpretation remains conditional because the higher-return-period StreamStats flows are extrapolated, field calibration data are unavailable, the stair-like energy-dissipation structure is not explicitly represented, and the terminal box culvert may influence the downstream-most hydraulic response. The case study therefore provides a conditional engineering comparison of channel, culvert-extension, and erosion-protection responses rather than a field-validated prediction of retrofit performance.
No takes yet. Share an insight, caveat, or question.
Alzubaidi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: