Answers are grounded in this paper and cite their sources.
Everton Football Club’s Hill Dickinson Stadium has been built on the site of Bramley-Moore Dock, Liverpool. This paper focuses on the dock infill and the associated geotechnical challenges. A baseline option would have been to remove existing soft dock deposits before infilling. However, the alternative of retaining dock deposits prior to infilling was more sustainable and reduced the programme duration. Three locations were sampled for sea-dredged sand to infill the dock. Oedometer and triaxial tests were undertaken using preparation methods that replicated the proposed dock filling process (a) sand dynamically compacted at the surface (b) sand falling loosely through water but affected by compaction and (c) sand falling loosely through the water but not affected by compaction. Results of the different sample areas were compared and creep settlement of the chosen site-winning location was calculated. This was combined with settlement estimates of the dock deposits to conclude the anticipated total settlement during construction and stadium design life. The paper describes the analysis and design undertaken to prove the feasibility of retaining the dock deposits through quantifying the magnitude and rate of settlement during construction and the design life of the stadium.
No takes yet. Share an insight, caveat, or question.
Rowe et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: