Answers are grounded in this paper and cite their sources.
Construction disputes significantly hinder project performance, causing delays and cost overruns. Predicting construction disputes accurately and interpreting the contributing factors transparently is crucial. To address these practical challenges, this research identifies 13 factors influencing construction disputes through a literature review, collects a data set of 222 project cases through expert interviews and adjudication cases published by the Supreme People’s Court in China, and employs six machine learning algorithms integrating Shapley additive explanations (SHAP) for interpretability. Additionally, we employed the synthetic minority oversampling technique (SMOTE) to address data imbalance, resulting in a balanced data set that enhanced the model’s generalization performance. Results showed that the extreme gradient boosting (XGBoost) algorithm provides the highest accuracy at 95.95% for construction dispute prediction, and the three most significant influential factors of construction disputes are willingness for future cooperation, stable cash flow, and project scale. This predictive model identifies the most suitable machine learning model and provides transparent insights, empowering practitioners to manage and mitigate construction disputes effectively. It is worth emphasizing that the integration of interpretable machine learning techniques within the context of construction dispute prediction not only enhances the model’s interpretability and generalization capabilities but also reveals the primary causes of disputes. This provides valuable insights for decision makers to formulate proactive intervention strategies. Furthermore, unlike in other fields, this study not only predicts the occurrence of disputes but also emphasizes identifying the underlying causes. Applying interpretable machine learning techniques to construction disputes enables clear attribution of the factors driving such conflicts and offers actionable insights for practitioners. For the construction industry, this prediction–interpretation–action closed-loop management approach offers greater practical value than merely producing probabilistic outputs.
No takes yet. Share an insight, caveat, or question.
Tian et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: