Answers are grounded in this paper and cite their sources.
Pipe enlargement can change hydraulic performance without producing a corresponding change in road availability. This study coupled a complete SWMM dual-drainage model of the Chongqing East Station area, containing 560 original stormwater pipes, with a physical-road graph of 577 nodes and 605 roads. For R50, R100 and R200 rainfall scenarios, the maximum numbers of roads closed at a 0.30 m mean-depth threshold were 13, 16 and 21, respectively. The corresponding blocked-road length–time losses were 0.3049, 0.3510 and 0.4105 km·h. Five successive R200 pipe-enlargement states were then compared with the baseline using a fixed score dominated by cumulative nodal overflow. All five states increased this score, so the baseline was retained. However, several enlargement states reduced road disruption; state 5 reduced length–time loss by 7.06% at the 0.30 m threshold. At a shallower 0.15 m threshold, some enlargement states increased road disruption. The three road-depth definitions also produced different cumulative losses, although no road in the three baseline cases exceeded 0.30 m at 360 min. These results show how the choice of evaluation measure can change the assessment of pipe enlargement and support considering road-network effects in drainage planning.
No takes yet. Share an insight, caveat, or question.
Yinghua et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: