Prestressed anchor cables are widely used for active deformation control in squeezing soft-rock tunnels, but their support effectiveness depends on whether prestress can be effectively established and retained under unfavorable geological and construction conditions. Taking the Anqiang Tunnel as a case study, this study investigates prestress establishment, construction-stage prestress loss, and construction-process modifications through theoretical analysis, laboratory experiments, and field investigations. The results show that anchorage performance is strongly influenced by rock-mass integrity, borehole conditions, and interfacial load transfer, while additional prestress loss occurs during tensioning and lock-off. Field comparisons indicate that adding one resin anchoring cartridge can improve tensioning-force development in fractured rock, whereas the original dosage may be retained under relatively favorable geological conditions. A combination of rapid- and medium-setting resin anchoring cartridges was associated with higher mean tensioning forces under the tested conditions. Exploratory laboratory observations also indicated that a bottom-hole stirrer improved resin filling continuity, although its field performance varied with geological and borehole conditions. Laboratory tests identified a preliminary candidate range of 10–13 mm for the limiting distance. Field comparisons supported the use of an elastic limiting device with an initial limiting distance of 10 mm, balancing prestress retention and construction practicality. The PT-20M system improved tensioning control, although its independent contribution to prestress retention could not be isolated. Sections using modified processes showed more favorable deformation responses, with reductions of 57.76% in horizontal convergence at the right arch foot of section Z2K78+427 and 82.59% in vault settlement at section K78+419 relative to the original-process sections. These differences should be interpreted considering the unmatched field conditions. Overall, the findings highlight the importance of aligning anchorage formation and tensioning procedures with geological conditions, while showing that process optimization cannot fully compensate for insufficient anchorage capacity in severely fractured and argillized rock masses.
No takes yet. Share an insight, caveat, or question.
Dong et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: