Construction projects frequently suffer from cost overruns and schedule delays, yet robust predictive tools remain limited, especially in data-scarce contexts. This study proposes a comparative data-driven framework that compares traditional regression models with Generative Pre-trained Transformer (GPT)-based large language models (LLMs) for predicting cost overruns in Egyptian construction projects. First, 30 completed projects with 12 key risk factors were used to model cost overruns using eight algorithms (linear regression, Ridge, Lasso, decision tree, random forest, gradient boosting, support vector regression (SVR), and multilayer perceptron (MLP)), with hyperparameters tuned by 5-fold cross-validation. Although the modelling dataset is limited (n = 30), this reflects real-world data availability constraints in developing construction markets, where high-quality, fully documented projects are scarce and often confidential. The Decision Tree Regressor achieved the best traditional-model performance, with a root mean square error (RMSE) of 15.56%, a mean absolute error (MAE) of 14.49%, and a coefficient of determination (R2) of 0.46. Second, GPT-3.5-Turbo, GPT-4.1, and GPT-4o were prompted with structured natural-language project descriptions to predict actual costs in Egyptian Pounds (EGP). Across the tested model–temperature combinations, GPT-4.1 with a refined chain-of-thought (CoT) prompt at temperature 0.1 showed the best performance, achieving an RMSE of 12.94%, an MAE of 7.46%, and an R2 of 0.74, clearly outperforming GPT-3.5-Turbo (R2 consistently negative) and achieving a better overall trade-off than GPT-4o (best configuration: RMSE = 10.98%, MAE = 7.92%, R2 =-0.05), which showed mixed results and frequent underestimation. Traditional regression provided a moderate baseline, whereas GPT-4.1, when combined with carefully engineered prompts, produced moderately accurate early-stage cost overrun estimates from text and outperformed all regressors. The findings highlight both the promising potential and the current limitations of the two approaches under the scarce and diverse project dataset.
No takes yet. Share an insight, caveat, or question.
Khaled et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: