Construction projects in Bangladesh rely on long, fragmented supply chains for steel, cement, bricks and other materials, yet the sector's supply chain risks have rarely been ranked against explicit criteria or tested for robustness. This study ranks 24 construction supply chain risks, compiled from the literature and screened with industry experts, on three criteria: probability of occurrence, impact on the project, and the strength of existing quality and control measures. Three managing directors of Bangladeshi real estate development firms, each with 15 to 20 years of experience, rated every risk on a seven-point linguistic scale in November 2022. Criterion weights came from the analytic hierarchy process (AHP) for conventional TOPSIS and from aggregated fuzzy weights for fuzzy TOPSIS, and both methods were run on the same expert judgments. Agreement among the experts was checked with Kendall's coefficient of concordance, and both rankings were tested under 27 one-at-a-time weight scenarios. Agreement was strong (W = 0.76 to 0.84, p < 0.001). Raw material quality ranked first under both methods, followed by rising raw material prices, accuracy of the project plan, natural disasters and high transportation cost, so the two methods produced the same top five in the same order. Raw material quality stayed first in 26 of 27 fuzzy TOPSIS scenarios and 21 of 27 TOPSIS scenarios, and the fuzzy rankings moved less when weights changed. Each top-ranked risk is linked to specific mitigation actions and the supply chain actor responsible for them, giving procurement and project managers a short, defensible list of where to act first.
No takes yet. Share an insight, caveat, or question.
Hossen et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: