Answers are grounded in this paper and cite their sources.
Data centers are among the most capital‑intensive and energy‑intensive facilities in the modern economy, yet muchof the power they pay for goes unused. Electrical capacity is provisioned for peaks and redundancy that rarely occur,servers run at low utilization, renewable energy is curtailed on the grids that serve them, and the heat they produce isusually released into the air. Anioke (2026) describes unused electricity and capacity of this kind as stranded power. Withglobal data center electricity use projected to rise from about 415 TWh in 2024 to around 945 TWh in 2030 (InternationalEnergy Agency [IEA], 2025), the cost of this waste is growing. This article examines how energy recovery and resourceoptimization can turn unused power into economic value. It identifies five value streams: recovering stranded capacityinside facilities, converting surplus renewable energy into low‑cost computing, selling flexibility to the grid, optimizingenergy costs through intelligent scheduling, and reusing waste heat. It also considers the role of enterprise analytics incapturing this value, the barriers that remain, and recommendations for operators, utilities, and policymakers.
No takes yet. Share an insight, caveat, or question.
Sowjanya Addu (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: