Answers are grounded in this paper and cite their sources.
Turbean Coffee produces coffee beverages before customers place their orders, so production volumes must be adjusted according to changes in sales and the availability of raw materials. This study aims to select the forecasting method with the lowest error, calculate material requirements, determine ordering policies, and compare inventory costs. Sales data from January–December 2025, recipe compositions, inventory costs, and supplier lead times were used in this case study. Three variations of the Moving Average MA2, MA3, and MA4 as well as the naïve method were tested over the period May–December 2025 using MAD, MSE, and MAPE. Material requirements were calculated based on sales and recipe proportions. Order quantities, safety stock, and reorder points were calculated using Economic Order Quantity (EOQ), Safety Stock, and Reorder Point. MA2 produced the lowest MAPE of 8.44% and a steady projection of 330.50 cups per month, or 3,966 cups in 2026. Actual sales of 3,410 cups in 2025 are equivalent to a demand of 85,250 g of coffee beans, 443.30 L of milk, 17,050 g of creamer, and 34,100 mL of each type of syrup. Based on the 2026 projection, the economic order quantity for coffee beans is 23,349.07 g, with a safety stock of 188 g and a reorder point of 1,752 g. The milk order quantity of 102.91 L is equivalent to approximately 63 days of operations. In a simulation using 2025 demand, inventory costs decreased from Rp20.93 million under monthly ordering to Rp11.25 million under the EOQ scenario, a difference of 46.26%. These results indicate that MA2 can serve as the basis for production planning, and EOQ helps estimate purchase quantities. The contribution of this study is to link sales forecasts with purchasing decisions for each material, including when orders need to be placed.
No takes yet. Share an insight, caveat, or question.
Nisa' et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: