Answers are grounded in this paper and cite their sources.
Against the background of rapid electrification of the global automotive industry, the scale of electric vehicle ownership continues to expand. The after-sales maintenance spare-parts system faces prominent practical pain-points: high unit component value, low turnover frequency, long and uncertain procurement lead-time, and stochastic spare-parts demand. Historical operational data show that high-voltage battery modules exhibit a 60% stock-out rate and 7.2-day average customer waiting time under conventional management. Traditional empirical inventory strategies relying on historical averages or static safety stock cannot adapt to stochastic fault arrival and supply-chain delay risks, resulting in the structural co-existence of spare-parts shortage and inventory overstock. This paper adopts the Poisson distribution to characterize random low-frequency spare-parts demand, and employs the two-parameter Weibull distribution to model asymmetric long-tail stochastic procurement lead-time. On this basis, a bi-objective stochastic simulation-embedded optimization model is constructed, minimizing expected total cost and maximizing composite service level. Multiple practical constraints are integrated, including warehouse capacity upper bound, total budget limit, minimum service-level requirement, and lead-time probabilistic coverage constraint. Verified by historical operational data collected from 12 domestic electric-vehicle after-sales service centers, simulated performance under the optimized solution reduces the stock-out rate of high-voltage battery modules from 60 to 5.2%, shortens the average customer waiting time from 7.2 to 2.1 days, increases the average inventory turnover rate of core electronic components from 1.36 times/year to 1.84 times/year, and cuts overall inventory holding cost by 4.5%. The business-desired turnover target of 2.0 times per year cannot be fully achieved for high-voltage battery modules due to its inherently low failure frequency, which only reaches 1.42 times/year in simulation. Sensitivity analysis demonstrates good model robustness when demand and procurement-cycle parameters fluctuate within ± 30%. This work provides theoretical foundations and decision support for stochastic-driven intelligent inventory optimization for low-frequency high-value electric-vehicle maintenance spare parts.
No takes yet. Share an insight, caveat, or question.
Shi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: