Answers are grounded in this paper and cite their sources.
Economic analysis is foundational in managing critical buried municipal water systems. This study evaluates the effectiveness of life cycle cost (LCC): the total cost of owning, operating, maintaining, and disposing of an asset over its lifetime, and equivalent uniform annual cost (EUAC): a method used in engineering to compare different projects or assets by converting all costs into an equivalent annual amount. This paper reviews these models in selecting pipeline renewal interventions and timing, using national cost and performance data from the Water Infrastructure Database (WATERiD) and Pipe Infrastructure Database (PIPEiD) covering 985,000 pipe segments and 37,000 failure events. Four strategies—do nothing, inspect/maintain, repair, and replace—were compared over a 50-year horizon, with costs normalized to 2025 USD via RSMeans indexes and model accuracy tested against American Water Works Association (AWWA) M28/M77 best practices. Monte Carlo simulations [1,000 trials with ± 20 % variation in service life and discount rate (3%–7%)] revealed that deterministic EUAC agreed with optimal renewal strategies in only 29.2% of cases, with errors primarily driven by service life uncertainty rather than discount rate fluctuations. While LCC/EUAC provide simple screening processes, they struggle as standalone decision tools under real-world variability. This work establishes the first national-scale empirical benchmark of LCC/EUAC performance, highlighting their role as first-stage filters and laying the foundation for hybrid fuzzy-economic models that integrate spatial risk and adaptive uncertainty handling. The follow-on to these efforts is then the development of an adaptive, fuzzy-enabled economic risk model that handles uncertainty throughout the planning window to provide robust pipe performance results that then drive the utility’s renewal planning efforts. Utility managers can leverage these findings to prioritize renewal activities, improve capital planning, and understand the limitations of traditional economic tools in dynamic infrastructure management.
No takes yet. Share an insight, caveat, or question.
Welling et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: