Answers are grounded in this paper and cite their sources.
Motivated by the high-concurrency fulfillment requirements of instant retail, this study investigates the joint optimisation of product zoning, continuous order batching, and picking task allocation in store-based overhead sorting systems. A mixed-integer linear programming model is formulated to minimise the number of synchronised picking task intervals required to complete the fulfillment wave under zone storage, central workbench, and handover station capacity constraints. A customised Three-Stage heuristic is developed by combining lower bound guided zoning, continuous order admission, and completion-oriented task allocation. On ten small-scale instances solved to proven optimality by Gurobi, the heuristic reaches the optimum in five cases and requires only one additional task interval in the remaining five. Across 24 larger test instances, it obtains or shares the lowest task count in 20 cases, achieves an average reduction of 31.82% relative to SA-FCFS, and requires 0.93 s on average. An industry-calibrated case further supports the applicability of the proposed framework under increasing demand. These results indicate the value of coordinating product zoning with downstream order execution in capacity-constrained instant-retail fulfillment.
No takes yet. Share an insight, caveat, or question.
Guo et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: