Answers are grounded in this paper and cite their sources.
The large number of check dams on China’s Loess Plateau has led to a situation in which their flood control capacity is approaching saturation due to long-term sediment deposition, making them increasingly vulnerable to cascading overtopping and chain-reaction impacts on downstream environments. This study develops a flood risk grading assessment framework for check dams, integrating a cascading breach simulation model composed of five interconnected analytical chains, along with a focused pilot application in the Chabagou dam system in Yulin City, Shaanxi Province, China. The framework comprises five sequentially coupled chains: data acquisition (Chain A), critical precipitation and failure probability analysis (Chain B), breach hydrograph simulation (Chain C), downstream flood routing and exposure identification (Chain D), and probability-loss based risk classification (Chain E). The output of each chain provides the key input to the next, forming an integrated workflow from basic data to final risk classification. Applied to 146 check dams in the Chabagou watershed, the framework identified four dams as high or extreme risk, indicating the need for priority hazard-mitigation measures. Overall, the proposed framework provides a systematic quantitative approach for check dam risk assessment and supports the identification of dams requiring enhanced safety management due to elevated risk levels.
No takes yet. Share an insight, caveat, or question.
Cui et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: