Despite the growth of Rwanda's construction sector, commercial building projects had continued to experience cost overruns, schedule delays, and quality deficiencies, partly reflecting weaknesses in systematic risk management practices.This study examined the influence of risk management strategies on performance of Ultimate Developers Limited commercial construction projects of Rwanda Social Security Board (RSSB), Rwanda.It assessed risk identification, risk assessment and analysis, risk response planning, and risk monitoring and control, guided by Enterprise Risk Management Theory, Systems Theory, and Contingency Theory.The quantitative component used structured questionnaires from 207 professionals, representing 98.1% of 211 distributed questionnaires.Pearson correlation and multiple linear regression were applied.Risk identification (β = 0.295, p < 0.001), risk assessment and analysis (β = 0.148, p = 0.005), risk response planning (β = 0.305, p < 0.001), and risk monitoring and control (β = 0.186, p = 0.001) had positive statistically significant relationships with project performance.The joint model explained 62.5% of the variation in performance (R² = 0.625).The study concluded that integrated risk management supported cost control, timely completion, and quality outcomes.It recommended institutionalizing risk registers, multidisciplinary risk reviews, risk-based contingency planning, and continuous monitoring and control procedures.
No takes yet. Share an insight, caveat, or question.
A 2026 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: