Answers are grounded in this paper and cite their sources.
To support the safe and green mining of structurally complex gold deposits, the three-dimensional numerical models at both the panel stope scale and the mine-wide full life-cycle scale were established using FLAC3D, taking the Xiaoshuijing gold mine in Chuxiong County, Yunnan Province as the engineering background, to investigate the stope structural stability and the risk of mining-induced surface deformation under layered cut-and-fill mining conditions. The gravitational stress field initialization method was applied to simulate stress redistribution and displacement responses throughout the cyclic layered excavation-backfilling process. The evolution of plastic zones in pillars, roofs, surrounding rock, drifts, and backfill bodies was also evaluated. The temporal-spatial evolution of surface subsidence at different stoping stages have been predicted. The results demonstrate that, as layered mining and backfilling progressed continuously. The overburden load and mining-induced disturbances were gradually transferred to the pillars and backfill bodies. The maximum pillar shear strain increment was approximately 6.805 × 10 −3. The development of a through-going plastic failure zone was not observed. After mining, the maximum displacement of the stope roof was 1.67 cm. The overall displacements of the pillars, backfill bodies, and drifts remained relatively small. The ground surface subsidence was primarily concentrated in the region above the orebody and progressively expanded from the central toward the north part of mining advanced. A maximum surface subsidence of 2.37 cm was recorded upon completion of stoping sequences 1, 2 and 3, and reached 2.68 cm at the end of the full life cycle of mining operations. Under the current simulation conditions, layered cut-and-fill mining is conducive to controlling stope deformation and surface subsidence while reducing the potential disturbance to the ecological environment caused by mining activities. The findings provide a reference for stope structure optimization, ground pressure control, and surface deformation monitoring in analogous layered cut-and-fill mining operations within complex-structure gold deposits.
No takes yet. Share an insight, caveat, or question.
Fei et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: