Answers are grounded in this paper and cite their sources.
Odour emissions remain one of the least integrated aspects during wastewater treatment plant (WWTP) design and operation and are still mainly addressed by end-of-pipe technologies that act once odorants have been formed and released. This review proposes the concept of process-integrated odour prevention (PiOP), in which odour is treated as a process engineering objective governed by microbial metabolism and operating conditions. The biochemical pathways that form reduced sulphur compounds, nitrogen-containing odorants and volatile organic compounds are first analysed, together with the operational factors that control them. After a critical overview of conventional abatement technologies, the review examines strategies that exploit streams and conditions already available in the plant, mainly activated sludge recycling (ASR) and oxidized nitrogen recycling (ONR), but also aeration, reactor configuration, sludge management and online monitoring. Available full-scale reports indicate substantial H2S reductions following ASR or ONR implementation, although the evidence remains limited by incomplete operational monitoring and the predominance of conference proceedings and technical reports. Their combination achieved 95% H2S reduction in pilot-scale experiments using synthetic wastewater, while preventing the sludge bulking observed with ASR alone. A decision framework for choosing between preventive and corrective strategies is proposed, and research gaps are identified, including full-scale validation, mechanistic modelling, digitalisation and the joint assessment of odour and greenhouse gas (GHG) emissions.
No takes yet. Share an insight, caveat, or question.
Sáez‐Orviz et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: