Answers are grounded in this paper and cite their sources.
The increasing automation of nuclear power plants introduces novel demands on operator situation awareness and workload management. Yet, commonly used measures of situation awareness and workload often lack comprehensive validation within nuclear contexts. This study evaluates four prominent measures: two of situation awareness (3D SART and SACRI) and two of workload (NASA-TLX and a secondary task performance metric) according to key psychometric criteria for nuclear control room simulations. Using the Rancor Microworld platform, twenty-six participants completed both routine and abnormal scenarios under different automation levels, following a within-subjects design. SACRI correlated with generated revenue and task time, NASA-TLX correlated with temperature management and number of actions, and secondary task performance correlated with task time; 3D SART showed no correlations. Predictive analyses showed that these relationships largely disappeared when automation level and scenario type were included as covariates. Sensitivity to experimental conditions varied across measures, with 3D SART and NASA-TLX affected by automation level, and NASA-TLX, SACRI and secondary task performance by scenario type. Measures were not redundant, and all demonstrated moderate reliability across experimental conditions. Findings provide insight to researchers and nuclear practitioners for selecting situation awareness and workload assessment tools and strengthening the technical basis for designing safer and more effective control room systems.
No takes yet. Share an insight, caveat, or question.
Gentile et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: