Answers are grounded in this paper and cite their sources.
The Korea Pathfinder Lunar Orbiter (KPLO), “Danuri,” conducted orbit maintenance during its two-year mission in a near-circular 100 km low lunar polar orbit. Since entering its mission orbit in January 2023, Orbit Maintenance Maneuvers (OMMs) were required to compensate for lunar perturbations, particularly the non-uniform lunar gravitational field. Over two years, 13 OMM pairs, each consisting of OMM-a and OMM-b burns, were executed through an integrated process of Orbit Determination (OD), Maneuver Planning (MP), and Maneuver Recovery (MR). Because onboard acceleration measurements were unavailable, maneuver performance was reconstructed from NASA’s Deep Space Network (DSN) tracking data using post-maneuver OD and targeter-based MR with thruster modeling. The preliminary and final OD solutions used for MP maintained uncertainties of several tens of meters in position and a few centimeters per second in velocity. Under Danuri’s operational conditions, reliable preliminary maneuver performance estimates could be obtained using tracking data collected within approximately 2–4 h after maneuver execution. Subsequent targeter-based MR enabled maneuver-performance reconstruction and iterative thrust-efficiency calibration, yielding an average reconstructed performance of approximately 99%. OMM planning was also adapted in two conjunction-risk cases while preserving orbit-maintenance objectives. These flight results validate a ground-based closed-loop OD–MP–MR framework for reliable low lunar orbit maintenance and maneuver-performance reconstruction without onboard acceleration measurements.
No takes yet. Share an insight, caveat, or question.
Bae et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: