Answers are grounded in this paper and cite their sources.
Deliverable 1.3 outlines the high-level project plan, budget allocation, and techno-economic analysis for each of the pilot sites within the PHAROS project. It utilises the structured framework for outlined in Deliverable 1.1 to ensure the feasibility and progression of the implementation plan of the 4 demonstrators within PHAROS. This deliverable provides a strategic roadmap for implementation, aligning technical, economic, and logistical considerations which will be elaborated upon in the following D1.4 where the specifics and details for the demonstrators will be included.
No takes yet. Share an insight, caveat, or question.
Ziemba et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: