Answers are grounded in this paper and cite their sources.
In this paper, we address the Contiguous Monotone Moldable Job Scheduling (CMMJS) problem, where a set of jobs must be scheduled on parallel machines to minimize the overall makespan. Each job is characterized by a processing time function mapping the number of assigned machines to a processing time, such that the corresponding work area function is non-decreasing. Building upon the framework and critical cases identified by Jansen and Ohnesorge (2026), we present an improved analytical approach that yields a tighter approximation ratio of 2√e2√e-1+ε ≈ 1.4353+ε with a running time of O(nmlog 1/ε). We prove that this worst-case analysis is essentially tight by providing a matching lower bound instance. This approximation ratio applies not only to contiguous scheduling but also to the non-contiguous variant of the problem. Finally, we demonstrate that our improved bounds extend naturally to heterogeneous environments; seamlessly integrating our results into an existing dual approximation framework for combined CPU/GPU scheduling by Germann~et~al.\ (2024) yields an improved overall approximation ratio of 2√e2√e-1+ε for the joint problem.
No takes yet. Share an insight, caveat, or question.
Edler et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: