New power systems in heavy-load areas are confronted with threefold pressures, namely insufficient power supply reliability, limited renewable energy accommodation and degraded operational safety. To address the above challenges, a multi-objective optimal configuration method for flexible interconnected power grid topology oriented to heavy-load areas is proposed. Taking the energy storage-based soft open point (E-SOP) as the core regulation and control carrier, the proposed method sets economic indicators as boundary constraints, and takes power balance, node voltage and other indicators as operational constraints. A multi-objective optimal configuration model of flexible interconnected power grid topology is established with three optimization objectives: reliability (minimum load loss after faults), environmental performance (minimum curtailed renewable energy power), and safety (minimum voltage deviation and minimum load rate variance), so as to realize the optimal configuration of new power systems in heavy-load areas. A modified IEEE 33-node test system is adopted to construct a heavy-load area case for verification. The simulation results demonstrate that after optimal configuration via the proposed method, the system can complete fault power transfer within 0.05 s; the power loss is reduced by 88.6%, the comprehensive photovoltaic curtailment rate drops from 22.6% to 4.7%, the minimum node voltage rises from 0.921 p.u. to 0.956 p.u., and the load rate variance is cut down by 88.3%. The results of this study provide a quantitative reference for the planning and retrofit of distribution networks in heavy-load areas with high renewable penetration, although the conclusions are obtained under the specific assumptions of the modified IEEE 33-node case.
No takes yet. Share an insight, caveat, or question.
Dong et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: