Answers are grounded in this paper and cite their sources.
Translating environmental, social and governance (ESG) commitments into project practice remains poorly understood, particularly in Central and Eastern Europe. This study examines how perceived organisational ESG integration and practitioners’ personal ESG engagement are associated with the perceived importance and rated organisational performance of sustainable project management (SPM) practices. Survey data from 171 Polish project professionals, a subsample of an international dataset, were analysed using paired-samples tests of the importance–performance gap across five project life-cycle phases, Spearman correlations with Holm adjustment, exploratory group comparisons, and k-means segmentation with bootstrap stability assessment. A systematic importance–performance gap emerged in all phases (overall dz = 0.61), which was numerically largest in monitoring and control. Perceived organisational ESG integration was associated with rated SPM performance (ρ = 0.35; n = 102), and personal ESG engagement with the importance assigned to SPM (ρ = 0.27; n = 132). Both associations remained significant after Holm adjustment, although exploratory contrasts between these dependent correlations were not reliably distinguishable in the common complete-case sample (n = 95). After adjustment for organisation size and age, the organisational association weakened, and its confidence interval included zero. Exploratory segmentation identified a respondent profile combining high SPM importance with low perceived organisational ESG integration. The findings distinguish professional valuation from rated organisational performance without establishing distinct causal pathways. Organisations should link ESG strategy with project-level metrics, governance mechanisms, clear responsibilities and competence development.
No takes yet. Share an insight, caveat, or question.
Wójcik et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: