Answers are grounded in this paper and cite their sources.
Architecture selection for the combined recovery of liquid hydrogen cold energy and low-grade engine waste heat in marine applications requires balancing power generation, economic cost, and system integration burden. This study adopts a baseline comprising a direct expansion branch and a closed recuperative supercritical hydrogen Brayton cycle. Connection rules for one or two organic Rankine cycles in series along the fuel stream, with optional parallel augmentation, generate four additional configurations. A system integration burden index is proposed to combine equipment mass, volume, and structural complexity. Process simulation and a genetic algorithm are used for three-objective optimisation of net power output, total annualised cost, and integration burden. The results show that cycle connections directly affect power distribution. At the compromise operating points, increased organic Rankine cycle output in the configurations with parallel augmentation is offset by reduced output from the other cycles, yielding no system net power gain. The configuration with one organic Rankine cycle in series is selected as the preferred option. It produces 375.78 kW, 17.98% above the baseline, achieves a net present value of $2.546 million, and has the lowest total annualised cost and integration burden among the configurations incorporating organic Rankine cycles. Two cycles in series increase the maximum net power output to 700.80 kW, only 1.48% above the corresponding maximum for one cycle. Structural complexity dominates differences in integration burden. At fixed compromise operating points, the burden ranking remains unchanged under five weighting schemes and simultaneous ± 5 % changes in the mass and volume scaling coefficients.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: