Answers are grounded in this paper and cite their sources.
During curtain grouting, changes in grout take affect how quickly borehole-mouth pressure reaches its setpoint and whether the pressure overshoots. We identified a pressure flow model in stage 1 of borehole S-413 at the Dongzhuang project and used deep deterministic policy gradient (DDPG) to select gains for an incremental proportional–integral–derivative (PID) controller. With the model coefficients fixed, we evaluated the full-stage response using the stage 2 data (18 time points; FIT: 82.06%). In five step-response simulations on the training model (1–5 MPa), DDPG–PID settled in 69 s on average with zero sampled overshoot, compared with 171 s for fixed-gain PID. In simulations of a five-stage pressure schedule, the root-mean-square tracking error was 0.034 MPa for DDPG–PID, 0.114 MPa for fixed-gain PID and 0.080 MPa for fuzzy PID. In separate matched transfer tests, the policy settled at all five setpoints on stage 1 of the neighboring borehole S-417 without retraining, with an approximately 7% increase in mean settling time relative to the training model.
No takes yet. Share an insight, caveat, or question.
Li et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: