Answers are grounded in this paper and cite their sources.
Building Information Modeling (BIM), Extended Reality (XR), multidisciplinary coordination, and Quantity Takeoff (QTO) are often implemented through separate workflows, weakening traceability between design decisions, issue resolution, and quantity changes. This study develops a technology-neutral BIM-XR-QTO framework using design-science research and a transparent purposive review of peer-reviewed literature and technical standards. The framework integrates a Common Data Environment (CDE), discipline and federated models, model-readiness gates, structured XR review, issue management, and rule-based quantity extraction within a controlled information workflow. A 12-requirement traceability assessment produced a Requirement Coverage Index of 22/24 (0.917). This value represents internal design completeness only and should not be interpreted as empirical evidence of effectiveness, productivity, accuracy, cost reduction, coordination efficiency, or user performance. A bounded MEP plant-room scenario demonstrates how an XR observation can be converted into a controlled issue, corrected in the source model, revalidated, and reflected in a QTO delta before baseline approval. The study identifies interoperability, semantic retention, registration accuracy, runtime performance, governance, cybersecurity, data ownership, and organizational readiness as key priorities for future independent project-based validation.
No takes yet. Share an insight, caveat, or question.
Hijazi et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: