Answers are grounded in this paper and cite their sources.
In mechanised tunnelling, the annular gap formed between the segmental lining and the surrounding soil must be filled immediately with adequate backfill grout to control ground movements and ensure structural stability of the tunnel lining. The grout must remain pumpable and develop sufficient early support after placement. This review provides a critical overview of backfill grouts used in mechanised tunnelling, covering their classification, performance requirements, material systems, laboratory characterisation, field applications and recent developments in sustainable binder technologies. Conventional single‐ and two‐component grouts are critically compared with emerging alternatives incorporating fly ash, ground granulated blast furnace slag (GGBFS) and geopolymer binders. In addition, recent advances in numerical modelling, intelligent mix optimisation and quality assessment techniques are discussed. In a numerical parameter study, faster grout hardening reduced surface settlement by approximately 75%; a separate field optimisation study reported a project‐specific reduction of 42%. Grout permeability affects pore pressure and lining forces together with ground and drainage conditions. Alternative binders offer potential benefits requiring application‐specific validation.
No takes yet. Share an insight, caveat, or question.
Youn‐Čale et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: